Recent Project: 150 MW Solar Project In ThailandĬontact us now, Free sample is available. At last, plastic closures and package in a small bag. Thirdly, test its waterproof and then test its wet insulation. After assembly, it’s the processes of testing. Fourth, auto assembly O-ring and connector. Next, use the machine to assembly positioning shrapnel. And then inject plastic into the solar connector mold. Profile connector 40/50 connects a series 40 profile to a series 50 profile. Profile connectors for the 40 & 50 series can be released from each other at anytime. Profile connectors for the 25 series form a permanent connection. Production Processes Of Solar parallel connectorįirst of all, need to die casting pins. Parallel Connectors Parallel connectors allow two profiles to be joined parallel to each other as an internal connection. Our factory strictly controls the quality of products according to the requirements of certification, ensuring long-term stable operation of solar energy systems with our solar connector and solar cable. TUV certification prevents personal injury and property damage may be caused during use connector. SYSOLAR obtains TUV, CE, RoHS, and other certifications.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |